Böschungsstabilisierung - Álvaro Casanova 2022

Mesh detail

Böschungsstabilisierung - Álvaro Casanova 2022

One month after installation: stabilized slope with beginning revegetation

Böschungsstabilisierung - Álvaro Casanova 2022

Side view of the project

Böschungsstabilisierung - Álvaro Casanova 2022

Side view from another perspective

 

Installationsjahr

2022

Ausgangslage

Slope stabilization in a residential area in La Reina, a neighborhood located on the eastern side of Santiago, Chile’s capital city.

Massnahme

A slope located in the surrounding area of La Reina required surface stabilization. The goal was to achieve a solution that would allow the revegetation of the system and replace a shotcrete solution.

Kunde

Ferrara

Geschützte Objekte

Wohngebiet

Ansprechpartner

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA

E-Mail

John Kalejta
 

John Kalejta

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,KS 67226 Wichita / USA

E-Mail

Bob Lyne
 

Bob Lyne

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / USA

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Naturgefahren
Geobrugg North America, LLC,OR 97302 Salem / USA

E-Mail