Monitoring - Mellitz 2021

Installation of Geobrugg GUARD on the top support rope with a torque wrench

Monitoring - Mellitz 2021

Rockfall barrier, view from behind

Monitoring - Mellitz 2021

Snowloads measured during winter 2020/2021

 
 

Year of installation

2021

Initial situation

The road has been protected for years by rockfall barriers RXI-200. Due to the high snowfall in this region, the Geobrugg GUARDs were installed for test purposes. The aim was to confirm that the Geobrugg GUARD also measures the slowly increasing snow load.

Description

To guarantee constant monitoring, three Geobrugg GUARD devices were installed:

  • With an acceleration sensor, larger rock impacts can be detected.
  • The force measurement measures the slow filling of the fence. This enables measuring the snow load in the winter months.
  • Furthermore, a corrosion sensor records the corrosion at this specific location, classifies it, and calculates the material service life.

Customer

BBA Lienz

Contractor

Felbermayr

Protected object

Road

Your local contact

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland

E-Mail