Suíça
Suíça

myGeobrugg

Monitoring - Mellitz 2021

Installation of Geobrugg GUARD on the top support rope with a torque wrench

Monitoring - Mellitz 2021

Rockfall barrier, view from behind

Monitoring - Mellitz 2021

Snowloads measured during winter 2020/2021

 
 

Ano de instalação

2021

Situação inicial

The road has been protected for years by rockfall barriers RXI-200. Due to the high snowfall in this region, the Geobrugg GUARDs were installed for test purposes. The aim was to confirm that the Geobrugg GUARD also measures the slowly increasing snow load.

Descrição

To guarantee constant monitoring, three Geobrugg GUARD devices were installed:

  • With an acceleration sensor, larger rock impacts can be detected.
  • The force measurement measures the slow filling of the fence. This enables measuring the snow load in the winter months.
  • Furthermore, a corrosion sensor records the corrosion at this specific location, classifies it, and calculates the material service life.

Promotor

BBA Lienz

Contratante

Felbermayr

Objecto protegido

Estrada

O seu contacto local

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça

E-mail