Switzerland
Switzerland

myGeobrugg

Debris Flow & Shallow Landslide Protection - Hellas Gold 2019

Debris flow barrier after installation, complete with abrasion protection and winglets

Debris Flow & Shallow Landslide Protection - Hellas Gold 2019

Before placing the anchors in concrete

Debris Flow & Shallow Landslide Protection - Hellas Gold 2019

Setting up the posts and fastening the pre-assembled ring net

Debris Flow & Shallow Landslide Protection - Hellas Gold 2019

Nearly finished - winglets and abrasion protection are next to come

 

Systems

 

Year of installation

2019

Initial situation

At the Hellas Gold mine, protection from debris flow had become necessary in phase 1 (2019 - 2027) area.

Description

Installation of a 4 meters high, u-shaped ring net debris flow barrier

Country/Region

Greece

Customer

Hellas Gold

Protected object

Mine / Quarry, Other

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Country Manager Southern Switzerland

E-Mail