アメリカ合衆国
アメリカ合衆国

myGeobrugg

 - Hellas Gold 2019

Debris flow barrier after installation, complete with abrasion protection and winglets

 - Hellas Gold 2019

Before placing the anchors in concrete

 - Hellas Gold 2019

Setting up the posts and fastening the pre-assembled ring net

 - Hellas Gold 2019

Nearly finished - winglets and abrasion protection are next to come

 

システム

 

設置年

2019

状況

At the Hellas Gold mine, protection from debris flow had become necessary in phase 1 (2019 - 2027) area.

説明

Installation of a 4 meters high, u-shaped ring net debris flow barrier

顧客名

Hellas Gold

保護対象

鉱山/採石場, その他

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / アメリカ合衆国 Regional Manager Northeast

お問い合わせフォーム

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / アメリカ合衆国 Regional Manager California

お問い合わせフォーム

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / アメリカ合衆国 Regional Manager Central US

お問い合わせフォーム

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / アメリカ合衆国 Regional Manager Southeast

お問い合わせフォーム

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

お問い合わせフォーム

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / アメリカ合衆国 Sales Director

お問い合わせフォーム