瑞士
瑞士

myGeobrugg

泥石流和滑坡防护 - Hellas Gold 2019

Debris flow barrier after installation, complete with abrasion protection and winglets

泥石流和滑坡防护 - Hellas Gold 2019

Before placing the anchors in concrete

泥石流和滑坡防护 - Hellas Gold 2019

Setting up the posts and fastening the pre-assembled ring net

泥石流和滑坡防护 - Hellas Gold 2019

Nearly finished - winglets and abrasion protection are next to come

 

系统

 

安装年份

2019

情况

At the Hellas Gold mine, protection from debris flow had become necessary in phase 1 (2019 - 2027) area.

描述

Installation of a 4 meters high, u-shaped ring net debris flow barrier

客户

Hellas Gold

防护对象

Mine / Quarry, Other

腐蚀保护

GEOBRUGG SUPERCOATING

其他安装的应用程序

矿井/隧道

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址