Switzerland
Switzerland

myGeobrugg

Bärenstein Werdohl - B229

Road fencing - Bärenstein Werdohl - B229 2018

The temporary barrier protecting drivers on the road as well as workers and machines on the construction site

Road fencing - Bärenstein Werdohl - B229 2018

The fence panels are mounted on standardized concrete barriers

Road fencing - Bärenstein Werdohl - B229 2018

The length of the temporary protective fence can be adjusted; it can also be moved with the construction site

Road fencing - Bärenstein Werdohl - B229 2018

Protected by the concrete fence barrier, the slope protection TECCO® mesh is installed on the rock face

 
 

System length

52 m

 

Year of installation

2018

Initial situation

To guarantee a consistent and fluent drive through at the construction site during the installation of the slope protection mesh a temporary concrete-fence-barrier secures the road.

Description

Geobrugg and its partner Nordbeton GmbH delivered all the material. Additionally, Nordbeton placed the concrete elements with their fleet of trucks and also installed the Debris Fence panels.

  • Concrete elements lenght: 4 m
  • Debris Fence panels height: 2.5 m

This system was developed for race tracks and is worldwide in use in motorsports.

Customer

Straßen NRW

Contractor

Salmen, D-Meschede

Engineering

Geobrugg AG / Nordbeton GmbH

Other participating companies

gbm Gesellschaft für Baugeologie und -meßtechnik mbH

Other installed applications

Rockfall Protection

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail