Slope Stability - Yellowstone 2022

View of the area

Slope Stability - Yellowstone 2022

Start of the reconstruction work of the damaged roadways

Slope Stability - Yellowstone 2022

Work in progress for the slope stabilization system

Slope Stability - Yellowstone 2022

Final touches on the TECCO Green

 
 

Year of installation

2022

Initial situation

In June 2022, Yellowstone National Park experienced historic flooding – damaging roads, water and wastewater systems, electrical infrastructure and other critical park infrastructure. To help with the reconstruction of the damaged roadways, GeoStabilization International was awarded two emergency design-build contracts for slope stabilization.
 

Description

The first works were done on the Old Gardiner Road Bypass at Mammoth Hot Springs, where damage at the Park’s North Entrance, cut off access to Gardiner, Montana. Approximately 20,000 square feet (1860 m2) of pinned mesh stabilized the slope, using our TECCO Green G65/3 to help promote revegetation.
 
The second included a buildout of approximately 120 linear feet (35 m) of the roadway at the East Entrance Gates adjacent to Middle Creek where flooding caused erosion of the bank and placed US Highway 14 in Wyoming at risk.

 

The pictures were provided by GeoStabilization International.

Country/Region

United States

Protected object

Road, Touristic infrastructure, Infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Natural Hazards
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland , Msc. Env. Eng.

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland Country Manager Southern Switzerland

E-Mail