myGeobrugg
At the tunnel entrance, just before the Nid d'Aigle arrival station, the Mont Blanc Tramway passes the foot of a cliff subject to rock falls.
The installation of a CANOPY deflector structure (self-cleaning up to 500 kJ) on a 70 meters long line, in addition to a wire mesh placed on the lower part of the rockface, allowed to secure the site.
Railway
GEOBRUGG SUPERCOATING