Language:
Englishen
United States
myGeobrugg

Registration

Do you have personal login information?

Register now
A company of the BRUGG Group
United States
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg

Klokova Mountain, National Road 5 (EO5)

view address in Google Maps  Share
Street
Ionia Odos Motorway 5
ZIP code
30014
Place
Mesolongi
Country/Region
Greece
Year of installation
2015
Customer
TERNA S.A.
Engineering
Freefall Geotechnical Engineering ZTGmbH
Contractor
Geobrugg AG
Other participating companies
Crestageo AG
Protected object
Road
Systems
GBE-1000A, GBE-2000A, GBE-3000A, GBE-100A-R, GBE-1000A-R, RXE-5000, RXE-8000
Energy absorption capacity
100 kJ, 2000 kJ, 3000 kJ, 1000 kJ, 5000 kJ, 8000 kJ
System height
3.0 m, 6.0 m
System length
60 m - 385 m
Corrosion protection
Galvanized, GEOBRUGG SUPERCOATING®
Situation

In order to provide protection to a national road around Klokova Mountain, a rockfall protection system was installed.  Installation allowed the advance drilling, blasting, and construction of a twin bore tunnel system; while minimizing the impact to travel in the area.  National Road (EO5) is the only North-South connection to the mainland, therefore, it is of high importance for the local economy.

Description

Geobrugg took over the responsibility of Contractor for rockfall protection installation.  Other works included:  rock scalling, rock bolting and finally, the installation of a wide range of rockfall barriers, including the GBE and RXE.

Your local contact

Head office and production
Head office and production
 
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Algodones NM 87001 / USA
Phone +1 505 771 4080
Mobile  

Contact form

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / USA
Mobile +1 860 377 3230

Contact form

Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / USA
Mobile +1 909 706 8964

Contact form

John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / USA
Mobile +1 505 220 1404

Contact form

Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / USA
Mobile +1 336 337 0945

Contact form

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Algodones NM 87001 / USA
Phone +1 505 771 4080
Mobile +1 505 400 0796

Contact form

Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards, Geotechnical products, Aquaculture
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / USA
Mobile +1 503 423 7258

Contact form