Idioma
Portuguêspt
Estados Unidos
myGeobrugg

Registo

Não iniciou sessão, gostaria de registar-se?

Na qualidade de utilizador registado de myGeobrugg você tem acesso ampliado aos downloads, às nossas ferramentas de dimensionamento e aos nossos eventos.

Registe-se agora
A company of the BRUGG Group
Estados Unidos
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg
Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg Klokova Mountain, National Road 5 (EO5) 2015 - Geobrugg

Klokova Mountain, National Road 5 (EO5)

   Compartilhar
Rua
Ionia Odos Motorway 5
Código postal
30014
Lugar
Mesolongi
País / Região
Grécia
Ano de instalação
2015
Cliente
TERNA S.A.
Engenharia
Freefall Geotechnical Engineering ZTGmbH
Contratante:
Geobrugg AG
Outras empresas envolvidas
Crestageo AG
Objecto protegido
Estrada
Sistemas
GBE-1000A, GBE-2000A, GBE-3000A, GBE-100A-R, GBE-1000A-R, RXE-5000, RXE-8000
Absorção de energia máxima
100 kJ, 2000 kJ, 3000 kJ, 1000 kJ, 5000 kJ, 8000 kJ
Altura do sistema
3.0 m, 6.0 m
Comprimento do sistema
60 m - 385 m
Protecção contra a corrosão
Galvanizado, GEOBRUGG SUPERCOATING®
Situação inicial

In order to provide protection to a national road around Klokova Mountain, a rockfall protection system was installed.  Installation allowed the advance drilling, blasting, and construction of a twin bore tunnel system; while minimizing the impact to travel in the area.  National Road (EO5) is the only North-South connection to the mainland, therefore, it is of high importance for the local economy.

Descrição

Geobrugg took over the responsibility of Contractor for rockfall protection installation.  Other works included:  rock scalling, rock bolting and finally, the installation of a wide range of rockfall barriers, including the GBE and RXE.

O seu contacto local

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Riscos naturais
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / Estados Unidos
Telefone +1 860 377 3230

Formulário de contacto

Saleh Feidi
Saleh Feidi
Regional Manager California
Riscos naturais
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / Estados Unidos
Telefone +1 909 706 8964

Formulário de contacto

John Kalejta
John Kalejta
Regional Manager Central US
Riscos naturais
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / Estados Unidos
Telefone +1 505 220 1404

Formulário de contacto

Bob Lyne
Bob Lyne
Regional Manager Southeast
Riscos naturais
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / Estados Unidos
Telefone +1 336 337 0945

Formulário de contacto

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Riscos naturais
Geobrugg North America, LLC
22 Centro Algodones
Telefone +1 505 771 4080
Telemóvel +1 505 400 0796

Formulário de contacto

Tim Shevlin
Tim Shevlin
Sales Director
Riscos naturais
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / Estados Unidos
Telefone +1 503 423 7258

Formulário de contacto