Fierza Hydroelectric Power Station #2

Debris Flow & Shallow Landslide Protection - Fierza Hydroelectric Power Station #2 2014

Installed SL-150 shallow landslide barrier.

Debris Flow & Shallow Landslide Protection - Fierza Hydroelectric Power Station #2 2014

Installation of post and ropes with brake rings.

Debris Flow & Shallow Landslide Protection - Fierza Hydroelectric Power Station #2 2014

Installation of SPIDER® high-tensile steel mesh on the barrier.

Debris Flow & Shallow Landslide Protection - Fierza Hydroelectric Power Station #2 2014

Finished SL-150 shallow landslide barrier.

 

Systems

 

System length

40 m - 75 m

 

Year of installation

2014

Initial situation

Shallow landslides were slipping into the lake and surrounding road.

Description

Landslide protection with shallow landslide barriers SL-150.

Customer

KESH Albania

Contractor

Cresta Geo Switzerland

Protected object

Road, Building

Corrosion protection

Galvanized

Engineering

-

Other participating companies

-

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail