瑞士
瑞士

myGeobrugg

Fierza Hydroelectric Power Station #2

泥石流和滑坡防护 - Fierza Hydroelectric Power Station #2 2014

Installed SL-150 shallow landslide barrier.

泥石流和滑坡防护 - Fierza Hydroelectric Power Station #2 2014

Installation of post and ropes with brake rings.

泥石流和滑坡防护 - Fierza Hydroelectric Power Station #2 2014

Installation of SPIDER® high-tensile steel mesh on the barrier.

泥石流和滑坡防护 - Fierza Hydroelectric Power Station #2 2014

Finished SL-150 shallow landslide barrier.

 

系统

 

系统长度

40 m - 75 m

 

安装年份

2014

情况

Shallow landslides were slipping into the lake and surrounding road.

描述

Landslide protection with shallow landslide barriers SL-150.

客户

KESH Albania

承包商

Cresta Geo Switzerland

防护对象

Road, Building

腐蚀保护

Galvanized

工程

-

分包商

-

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址