Switzerland
Switzerland

myGeobrugg

Rockfall Protection - Craster Quarry Car Park 2019

First small rock fall stopped only days after completion.

Rockfall Protection - Craster Quarry Car Park 2019

The imposing west wall, showing recent rock fall.

Rockfall Protection - Craster Quarry Car Park 2019

Posts in place ready for pulling of ring net panels. Note the rope separation for a direction change from the west wall to the back wall of the quarry.

Rockfall Protection - Craster Quarry Car Park 2019

Change of direction after completion of the barrier.

Rockfall Protection - Craster Quarry Car Park 2019

Attaching of the secondary mesh.

 

Systems

 

System length

167 m

 

Year of installation

2019

Initial situation

The client planned to extend the current car park. It was identified that the new areas of the car park could be at risk of falling rocks from the quarry walls. The designer calculated that the energy of the falling blocks would require a 2 metres high 500 kJ rockfall barrier.

Description

We were approached by the client asking for advice on which would be the best barrier to use for this project.  After being presented the options he went for the RXE-500. This gave a good balance between cost, performance, and ease of installation in the expected ground conditions.

Colin Jones (Rock Engineering) were selected to install the barrier, on arriving at site it was rapidly ascertained that the ground conditions were not rock at surface as expected, but a several metres thick layer of made up ground.  Both the client and contractor were impressed with the speed we were able to mobilise to site. Within a few hours, we had a new plan in place for post bases and anchors using Geobrugg standard details enabling a rapid approval by the design engineer.

The barrier was built two weeks ahead of the schedule programmed by the contractor. They attributed this to the ease of installation combined with the clarity of the manuals along with the ease of support via telephone or site visits from Geobrugg engineers.

Customer

Northumberland County Council

Contractor

Colin Jones (Rock Engineering) Ltd.

Protected object

Mine / Quarry, Touristic infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Daeargeo

Other installed applications

Underground & Open Pit Mining

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail