Craster Quarry Car Park

落石防护 - Craster Quarry Car Park 2019

First small rock fall stopped only days after completion.

落石防护 - Craster Quarry Car Park 2019

The imposing west wall, showing recent rock fall.

落石防护 - Craster Quarry Car Park 2019

Posts in place ready for pulling of ring net panels. Note the rope separation for a direction change from the west wall to the back wall of the quarry.

落石防护 - Craster Quarry Car Park 2019

Change of direction after completion of the barrier.

落石防护 - Craster Quarry Car Park 2019

Attaching of the secondary mesh.

 

系统

 

系统长度

167 m

 

安装年份

2019

情况

The client planned to extend the current car park. It was identified that the new areas of the car park could be at risk of falling rocks from the quarry walls. The designer calculated that the energy of the falling blocks would require a 2 metres high 500 kJ rockfall barrier.

描述

We were approached by the client asking for advice on which would be the best barrier to use for this project.  After being presented the options he went for the RXE-500. This gave a good balance between cost, performance, and ease of installation in the expected ground conditions.

Colin Jones (Rock Engineering) were selected to install the barrier, on arriving at site it was rapidly ascertained that the ground conditions were not rock at surface as expected, but a several metres thick layer of made up ground.  Both the client and contractor were impressed with the speed we were able to mobilise to site. Within a few hours, we had a new plan in place for post bases and anchors using Geobrugg standard details enabling a rapid approval by the design engineer.

The barrier was built two weeks ahead of the schedule programmed by the contractor. They attributed this to the ease of installation combined with the clarity of the manuals along with the ease of support via telephone or site visits from Geobrugg engineers.

客户

Northumberland County Council

承包商

Colin Jones (Rock Engineering) Ltd.

防护对象

Mine / Quarry, Touristic infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Daeargeo

其他安装的应用程序

矿井/隧道

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址