United States
United States

myGeobrugg

Rockfall protection barriers GBE

GBE barriers: Highly cost-effective barriers thanks to simple installation

Lightweight and pre-assembled, GBE barriers are easy to install and economical, with energy capacities up to 5000 kJ. They provide reliable protection according EAD 340059-00-0106 class A for light to medium rockfall risks, blending harmoniously into the environment.

Low anchor forces

Short anchors are sufficient. This significantly lowers drilling time during installation and
therefore the overall costs of the project.

Pre-assembled

The posts are delivered to the construction site as modules with pre-installed bundles of mesh. This significantly reduces the installation time as well as making the process easier.

High safety standards

Our barriers fulfill the EAD 340059-00-0106 (ETAG 027) guidelines, most of them bear the CE mark, and are tested according to the most demanding method in vertical free fall.

Light and unobtrusive

The barrier's low weight makes it easy to install. With its high-tensile steel wire and innovative design, this solution conserves materials, protects the environment and is virtually invisible from a distance.

Videos

References

To the project
Cheddar Gorge, Cliff Road

Cheddar, United Kingdom

 

Systems

GBE-1000A

 

Year of installation

2026

To the project
Pech de Foix

Foix, France

 

Systems

GBE-1000A
GBE-3000A

 

System length

72 m

 

Year of installation

2022

To the project
Ten West Link

Arizona, United States

 

Systems

GBE-100A-R

 

System length

230 m

 

Year of installation

2022

To the project
Northfleet

Dartford, United Kingdom

 

Systems

GBE-500A-R

 

Year of installation

2023

To the project
Railway Iseo - Edolo

Tratta ferroviaria Iseo - Edolo, Italy

 

Systems

Geobrugg GUARD
VX
GBE-2000A
GBE-3000A

 

Year of installation

2023

To the project
Ujsoły

Ujsoły, Poland

 

Systems

GBE-500A

 

Year of installation

2021

To the project
Muriwai Drive

Whakatane, New Zealand

 

Systems

GBE-1000A-R

 

Year of installation

2019

To the project
San Gavino Di Tenda RD62

San Gavino Di Tenda, Corse, France

 

Systems

ATT-80
GBE-1000A
GBE-2000A

 

Year of installation

2022

To the project
Hordaland

Ulvik, Norway

 

Systems

GBE-3000A
RXE-5000

 

Year of installation

2021

To the project
IRCON Tunnel 7 -P2, Teesta Bridge, Sivok Rangpo Railway

West Bengali, India

 

Systems

GBE-2000A

 

Year of installation

2021

To the project
Rastoke D1 state road protection

Rastoke/Slunj, Croatia

 

Systems

SPIDER® S3-130
GBE-100A

 

Year of installation

2026

To the project
Rebuilding the Ahrtal

Ahrtal, Germany

 

Systems

GBE-500A
RXE-2000
GBE-1000A
TECCO® G65/3
TECCO® G65/4

 

Year of installation

2025

To the project
Šoštanj (Lokovica)

Šoštanj, Slovenia

 

Systems

GBE-1000A

 

Year of installation

2025

To the project
Cuenca - Molleturo - Km. 49

Cuenca, Ecuador

 

Systems

GBE-100A-R
TECCO® G65/3
Geobrugg GUARD

 

Year of installation

2023

To the project
CADASA Rioseco

Rioseco, Sobrescobio (Asturias), Spain

 

Systems

GBE-1000A
RXE-1000
Rockfall drape
TECCO® G65/3
TECCO® G65/4

 

Year of installation

2022

To the project
Coal Mine

Highveld coalfields, South Africa

 

Systems

GBE-100A-R

 

System length

132 m

 

Year of installation

2021

To the project
Estrada Comandante Camacho de Freitas, Madeira

Funchal, Portugal

 

Systems

GBE-3000A

 

Year of installation

2020

To the project
El Juncal, Route 60CH Curves 4

Ruta 60Ch, Chile

 

Systems

GBE-500A
Geobrugg GUARD

 

Year of installation

2019

To the project
Khasab coast road

Al Khasab, Oman, Oman

 

Systems

RXE-5000
GBE-3000A
GBE-1000A
GBE-2000A
RXE-8000

 

System length

1500 m

 

Year of installation

2019

To the project
Op der Gare

Michelau, Luxembourg

 

Systems

GBE-100A
GBE-500A

 

System length

60 m

 

Year of installation

2018

To the project
Trek route to Shri Mata Vaishno Devi Shrine (1)

Katra, Jammu & Kashmir, India

 

Systems

RXE-5000
RXE-8000
GBE-3000A

 

System length

110 m

 

Year of installation

2016

To the project
Klokova Mountain, National Road 5 (EO5)

Mesolongi, Greece

 

Systems

GBE-100A-R
GBE-1000A
GBE-1000A-R
GBE-2000A
GBE-3000A
RXE-5000
RXE-8000

 

System length

385 m

 

Year of installation

2015

To the project
PH Belen

PH Belén, Power House Station, Costa Rica

 

Systems

GBE-500A-R
GBE-1000A
TECCO® System
SL-150
DELTAX® G80/2

 

System length

24 m

 

Year of installation

2015

To the project
Oia Village - Santorini Island

Santorini, Greece

 

Systems

GBE-500A
GBE-1000A
GBE-2000A

 

Year of installation

2013

To the project
Hemlo Mine

Hemlo, Ontario, Canada

 

Systems

ATTENUATOR Customized
TECCO® G65/3
GBE-1000A-R

 

Year of installation

2020

Contacts

Saleh Feidi
   

Saleh Feidi

Natural Hazards
Impact Protection
Bryant Jackson
   

Bryant Jackson

Natural Hazards
Impact Protection
John Kalejta
   

John Kalejta

Regional Manager Rocky Mountains / Central USA

Natural Hazards
Impact Protection
Robert Long
   

Robert Long

Regional Sales Manager Southeast

Natural Hazards
Impact Protection
Pierce Runnels, Civil Engineer
     

Pierce Runnels, Civil Engineer

Sales Director North America

Natural Hazards
Tim Shevlin
   

Tim Shevlin

Natural Hazards
Impact Protection