Switzerland
Switzerland

myGeobrugg

Rockfall Protection - Piwniczna Zdrój DK87 2016

GBE-500-A rockfall barrier along the state road DK87 Piwniczna Zdrój

Rockfall Protection - Piwniczna Zdrój DK87 2016

Loose rock above the road

Rockfall Protection - Piwniczna Zdrój DK87 2016

Over 350 meters of road protected by rockfall barriers

 

System length

108 m - 252 m

 

Year of installation

2016

Initial situation

During the construction of the DK87 national road on the section Piwniczna Zdrój, rock fragments falling from the Kicaz mountain slope were identified as a threat to the traffic.

Description

To protect the road from rock chips and boulders, GBE-100-A-R and GBE-500-A rock catch fences were installed in four locations. The total length of all barriers is 360 meters.

Check also the Piwniczna Zdrój DW97 slope protection project.

Customer

GDDKiA Oddział Kraków

Engineering

BMD Sp. z o.o.

Contractor

BMD Sp. z o.o.

Corrosion protection

Galvanized

Your local contact

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland

E-Mail