Slope Stability - Zion Hill 2015

TECCO® SYSTEM3 after all protection works are finished.

Slope Stability - Zion Hill 2015

Installed TECCO® SYSTEM3.

Slope Stability - Zion Hill 2015

TECCO® G65/3 rolls during installation.

Slope Stability - Zion Hill 2015

Slope nails installation using portable, suspended drill rig. For extra protection drilling works were executed through TECCO® G65/3 mesh.

 
 

Year of installation

2015

Initial situation

Rockfall from the channel wings meant risk for the channel workers.

Description

Slope stabilization with TECCO® SYSTEM3 mesh and anchors with 32 mm diameter every 2.5 m.

Customer

Autoridad del Canal de Panamá - ACP

Contractor

Alvarado & Düring International

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Autoridad del Canal de Panamá - ACP

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail