スイス
スイス

myGeobrugg

 - Trishuli 3A Hydropower 2018

Trishuli 3A Hydropower dam site

 - Trishuli 3A Hydropower 2018

View of dam from the uppermost installation site

 - Trishuli 3A Hydropower 2018

Preliminary design concept

 - Trishuli 3A Hydropower 2018

Installation of RXE-5000 rockfall protection barrier with a height of 6 meters

 - Trishuli 3A Hydropower 2018

Installation of RXE-5000

 - Trishuli 3A Hydropower 2018

Installation of RXE-5000, height 6 meters

 - Trishuli 3A Hydropower 2018

Impact in RXE-5000

 
 

システム延長

150 m - 240 m

 

設置年

2018

状況

Trishuli 3A Hydropower project is a 60 MW hydroelectric project being constructed in Rasuwa, Nepal. During the 2015 earthquakes, the dam site and access road were seriously damaged. Construction works came to a complete stop.

説明

After analyzing the identified source zone for the rockfall on the hills above the dam site: A series of four rockfall barrier lines, in addition to an active slope stabilization system, were installed to protect the infrastructure in the valley.

Also watch the clip of the installation works

国名

ネパール

顧客名

Nepalese Army

下請

Tactical Solutions Pvt. Ltd.

保護対象

道路, インフラ

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム