Trishuli 3A Hydropower

Nepal, Nepal
2018
Client
Nepalese Army
Alte companii implicate
Tactical Solutions Pvt. Ltd.
Obiect protejat
Road, Infrastructură
Clasă de energie
3000 kJ, 5000 kJ
Înălţime sistem
5.0 m, 6.0 m
Lungime sistem
150 m - 240 m
Protecţie împotriva coroziunii
GEOBRUGG SUPERCOATING
Alte aplicaţii instalate
Stabilizarea pantelor
Situația inițială

Trishuli 3A Hydropower project is a 60 MW hydroelectric project being constructed in Rasuwa, Nepal. During the 2015 earthquakes, the dam site and access road were seriously damaged. Construction works came to a complete stop.

Descriere

After analyzing the identified source zone for the rockfall on the hills above the dam site: A series of four rockfall barrier lines, in addition to an active slope stabilization system, were installed to protect the infrastructure in the valley.

Also watch the clip of the installation works

Contactul dvs. local

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Natural Hazards, Coastal Erosion Protection, Minerit / Tuneluri
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Elveţia
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Natural Hazards, Minerit / Tuneluri
Geobrugg AG
Industriestrasse 21
5200 Brugg / Elveţia
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Natural Hazards, Minerit / Tuneluri
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Elveţia