스위스
스위스

myGeobrugg

낙석방호시스템 - Trishuli 3A Hydropower 2018

Trishuli 3A Hydropower dam site

낙석방호시스템 - Trishuli 3A Hydropower 2018

View of dam from the uppermost installation site

낙석방호시스템 - Trishuli 3A Hydropower 2018

Preliminary design concept

낙석방호시스템 - Trishuli 3A Hydropower 2018

Installation of RXE-5000 rockfall protection barrier with a height of 6 meters

낙석방호시스템 - Trishuli 3A Hydropower 2018

Installation of RXE-5000

낙석방호시스템 - Trishuli 3A Hydropower 2018

Installation of RXE-5000, height 6 meters

낙석방호시스템 - Trishuli 3A Hydropower 2018

Impact in RXE-5000

 

System length

150 m - 240 m

 

Year of installation

2018

Situation

Trishuli 3A Hydropower project is a 60 MW hydroelectric project being constructed in Rasuwa, Nepal. During the 2015 earthquakes, the dam site and access road were seriously damaged. Construction works came to a complete stop.

Description

After analyzing the identified source zone for the rockfall on the hills above the dam site: A series of four rockfall barrier lines, in addition to an active slope stabilization system, were installed to protect the infrastructure in the valley.

Also watch the clip of the installation works

Customer

Nepalese Army

Protected object

Road, Infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Subcontractor

Tactical Solutions Pvt. Ltd.

Other installed applications

비탈면 보강 시스템

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail