落石防护 - Trishuli 3A Hydropower 2018

Trishuli 3A Hydropower dam site

落石防护 - Trishuli 3A Hydropower 2018

View of dam from the uppermost installation site

落石防护 - Trishuli 3A Hydropower 2018

Preliminary design concept

落石防护 - Trishuli 3A Hydropower 2018

Installation of RXE-5000 rockfall protection barrier with a height of 6 meters

落石防护 - Trishuli 3A Hydropower 2018

Installation of RXE-5000

落石防护 - Trishuli 3A Hydropower 2018

Installation of RXE-5000, height 6 meters

落石防护 - Trishuli 3A Hydropower 2018

Impact in RXE-5000

 
 

系统长度

150 m - 240 m

 

安装年份

2018

情况

Trishuli 3A Hydropower project is a 60 MW hydroelectric project being constructed in Rasuwa, Nepal. During the 2015 earthquakes, the dam site and access road were seriously damaged. Construction works came to a complete stop.

描述

After analyzing the identified source zone for the rockfall on the hills above the dam site: A series of four rockfall barrier lines, in addition to an active slope stabilization system, were installed to protect the infrastructure in the valley.

Also watch the clip of the installation works

国家/地区

尼泊尔

客户

Nepalese Army

分包商

Tactical Solutions Pvt. Ltd.

防护对象

Road, Infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址