美国
美国

Trishuli 3A Hydropower

Nepal, 尼泊尔
2018
客户
Nepalese Army
分包商
Tactical Solutions Pvt. Ltd.
防护对象
Road, Infrastructure
能级
3000 kJ, 5000 kJ
系统的高度
5.0 m, 6.0 m
系统长度
150 m - 240 m
腐蚀保护
GEOBRUGG SUPERCOATING
其他安装的应用程序
边坡稳定
情况

Trishuli 3A Hydropower project is a 60 MW hydroelectric project being constructed in Rasuwa, Nepal. During the 2015 earthquakes, the dam site and access road were seriously damaged. Construction works came to a complete stop.

描述

After analyzing the identified source zone for the rockfall on the hills above the dam site: A series of four rockfall barrier lines, in addition to an active slope stabilization system, were installed to protect the infrastructure in the valley.

Also watch the clip of the installation works

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
自然災害防護
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
Saleh Feidi
Saleh Feidi
Regional Manager California
自然災害防護
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
John Kalejta
John Kalejta
Regional Manager Central US
自然災害防護
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
Bob Lyne
Bob Lyne
Regional Manager Southeast
自然災害防護
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
自然災害防護
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
自然災害防護
Geobrugg North America, LLC
Salem OR 97302 / 美国