システム延長

100 m

 

設置年

2018

状況

Planned extensions to the sandstone, Gritstone quarry required the extraction of overburden. Materials had the potential to travel down the outer edge of the site, down to the A44 road.

Key Geosolutions undertook rockfall analysis and calculated that a 500kJ and 3 metres high rockfall system would be required.

説明

Derbyshire Geotechnical contacted Geobrugg for advice on system types best suited for this location.

After an initial site visit, it was agreed that the GBE-500A would be the best option as the reduced post weight over that of the GBE-500A-R allowed for easier installation due to the limited access routes to the location.

The 100 m long system with post spacings of 10 m (11 posts) was secured with 2nr 4 m long threaded bars. Upslope and lateral anchors were 6 m long threaded bars fitted with Geobrugg flexheads.

国名

イギリス

顧客名

Tarmac Ltd

エンジニアリング

Key Geosolutions

落札者

Derbyshire Geotechnical

下請

None

保護対象

鉱山/採石場

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

お問い合わせフォーム

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス , Msc. Env. Eng.

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム