Situation

Planned extensions to the sandstone, Gritstone quarry required the extraction of overburden. Materials had the potential to travel down the outer edge of the site, down to the A44 road.

Key Geosolutions undertook rockfall analysis and calculated that a 500kJ and 3 metres high rockfall system would be required.

Description

Derbyshire Geotechnical contacted Geobrugg for advice on system types best suited for this location.

After an initial site visit, it was agreed that the GBE-500A would be the best option as the reduced post weight over that of the GBE-500A-R allowed for easier installation due to the limited access routes to the location.

The 100 m long system with post spacings of 10 m (11 posts) was secured with 2nr 4 m long threaded bars. Upslope and lateral anchors were 6 m long threaded bars fitted with Geobrugg flexheads.

Customer

Tarmac Ltd

Engineering

Key Geosolutions

Contractor

Derbyshire Geotechnical

Subcontractor

None

Protected object

Mine / Quarry

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
수리학
광산 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

이메일

Olivia Sartorius
   

Olivia Sartorius

자연 재해
수리학
광산 / 터널
Geobrugg AG

이메일

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

이메일

Isacco Toffoletto
   

Isacco Toffoletto

자연 재해
수리학
광산 / 터널
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스

이메일