Switzerland
Switzerland

myGeobrugg

Ablenkschutz Brückenpfeiler, Averstrasse

Rockfall Protection - Ablenkschutz Brückenpfeiler, Averstrasse 2008

.

Rockfall Protection - Ablenkschutz Brückenpfeiler, Averstrasse 2008

.

Rockfall Protection - Ablenkschutz Brückenpfeiler, Averstrasse 2008

.

 

System length

18 m

 

Year of installation

2008

Initial situation

The old bridge over the Reno di Lei was hit by a rockfall. As part of the restoration work, a suitable measure was sought for protecting the old bridge – and the abutment of the new bridge situated above it – from falling rock. For reasons of aesthetics and to preserve the surrounding countryside, it was not possible to construct a rockfall protection roof above the portal.

Description

The solution presented by Geobrugg envisioned a RXI-200 rockfall barrier (2000 kJ) acting as a deflector, with the system being aligned almost vertically above the abutment. In contrast to a conventional rockfall barrier, three central suspension cables were installed in addition to the upper and lower suspension cables in order to reduce net deflection and allow rocks to be diverted.

Customer

Graubünden Civil Engineering Authority

Contractor

Crestageo AG, Chur

Protected object

Road, Other

Engineering

DIAG Davoser Ingenieure AG, Davos / Switzerland

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail