Switzerland
Switzerland

myGeobrugg

Hoover Dam Visitors Center

Rockfall Protection - Hoover Dam Visitors Center 2020

Installation of the rockfall protection at the Hoover Dam

Rockfall Protection - Hoover Dam Visitors Center 2020

DELTAX® mesh is "wrapped" around the boulder

Rockfall Protection - Hoover Dam Visitors Center 2020

The boulder covered with mesh

Rockfall Protection - Hoover Dam Visitors Center 2020

Rockfall barrier underneath the boulder

Rockfall Protection - Hoover Dam Visitors Center 2020

Protected area around the visitors center, the protective installation is visible on top of the picture

 

Systems

 

Year of installation

2020

Initial situation

Removal of a 16,000 lb rock block

Geovert developed a methode to remove the boulder without any damage to the existing infrastructure located in the fall line directly below the block - escalators, and entrance to the Visitors Center Building.

Description

  • Installation of a temporary GBE-1000A rockfall barrier - 4 meters high (rock face connections on both sides).  
  • A section of DELTAX® mesh was installed over the boulder, the boulder was drilled, and expansive grout was used to downsize the boulder into manageable blocks. 
  • After cracking the boulder with grout, the resulting blocks we scaled into the mesh/barrier in controlled operations. Once in the rockfall barrier, rock and debris were lowered to the ground and removed.  

Contractor

Protected object

Touristic infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail