Switzerland
Switzerland

myGeobrugg

Tumbarumba, Snowy Valley Council

Slope Stability - Tumbarumba, Snowy Valley Council 2018

Installation completed: the mesh is fixed on the structured rockface with spike plates

Slope Stability - Tumbarumba, Snowy Valley Council 2018

Parts of the slope are additionally covered with a revegetation system.

Slope Stability - Tumbarumba, Snowy Valley Council 2018

The bumpy embankment covered with mesh and an erosion control mat.

Slope Stability - Tumbarumba, Snowy Valley Council 2018

Passive stabilisation on the left side where the nets works as a drape. Active stabilisation on the right side with a «pattern» of spike plates.

 

Year of installation

2018

Initial situation

Failing slope on road cutting. 

Description

Geobrugg provided DELTAX® with P33/40 spike plates for an active system, with TECMAT® where required and also the use of DELTAX for a drape appliction.

Customer

Snowy Valley Council

Protected object

Road

Corrosion protection

GEOBRUGG ULTRACOATING

Engineering

Specialised Geo Pty Ltd

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail