Switzerland
Switzerland

myGeobrugg

Rockfall Protection - Ten West Link 2022

Rockfall barriers protecting the transmission line towers.

Rockfall Protection - Ten West Link 2022

Lateral view of the rockfall barrier

 

Systems

 

System length

- 230 m

 

Year of installation

2022

Initial situation

The Ten West Link project is a new power project from Southern Arizona & California. The project goes across the Eagletail Mountains & Wildreness, where transmission line towers will be built.

Description

Geobrugg was tasked with providing ten GBE-100A-R rockfall barriers to protect ten transmission line towers that will be built. The barriers are three meters high with a total length of 230 meters.

These barriers will protect personnel, roadway and future transmission lines. This particular transmission line will span 125 miles connecting Arizona and California, improving transmission system efficiency and reliability.

Thank you Adams Contracting for the pictures. 

Country/Region

United States

Contractor

Protected object

Road, Infrastructure

Corrosion protection

Galvanized

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Country Manager Southern Switzerland

E-Mail