Switzerland
Switzerland

myGeobrugg

Stelzentunnel Tunnel Maintenance

Road fencing - Stelzentunnel Tunnel Maintenance 2017

Stelzentunnel: driving lanes and the construction site area are separated from each other and ensure safety on both sides. In the picture: before extending the panels to the required height

Road fencing - Stelzentunnel Tunnel Maintenance 2017

Bottom: standard «step» concrete element; top: braced against the ceiling

Road fencing - Stelzentunnel Tunnel Maintenance 2017

The rapid construction and mobility of the system require only short road closures in the tunnel

Road fencing - Stelzentunnel Tunnel Maintenance 2017

Fence panels with wooden boards - they protect the traffic from dust and water of the construction works and withstand the airflow of the trucks.

Road fencing - Stelzentunnel Tunnel Maintenance 2017

Close-up panel with formwork panels

 

Systems

Special Solutions Mobile Road Fencing

 

System length

400 m

 

Year of installation

2017

Initial situation

One of Switzerland's central motorways runs through the Stelzentunnel near Zurich. Since 2017, the Stelzentunnel (1.6 km long) has been renovated in stages.

A mobile protective fence separates the trafficable lanes from the construction site. One of the requirements of this protective fence was that it could be erected quickly so that the motorway only needs to be closed for a few hours.

Description

Geobrugg optimized the design of the mobile debris fence used at motorsport venues to comply with the requirements for road works in a tunnel. The NORDBETON motorsport concrete barriers have been changed to standard NORDBETON public roadwork concrete barriers. Additionally, the debris fence panels have been extended to the on-site tunnel height and stabilized accordingly. They are telescopic and can be braced in the tunnel ceiling. Das System ist in der Höhe zwischen zwei und vier Metern anpassbar.

Customer

Arge Nordring Los 4

Contractor

Geobrugg AG

Engineering

Geobrugg AG

Other participating companies

NORDBETON GmbH

Other installed applications

Impact Protection

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail