United States
United States

Stanwell Park, Railway Corridor, 2020

Lawrence Hargrave Drive (Rail Corridor), 2508, Stanwell Park New South Wales, Australia
2020
Contractor
Protected object
Railway
Energy absorption capacity
500 kJ
System height
3.0 m
System length
147 m
Corrosion protection
GEOBRUGG ULTRACOATING
Initial situation

Rockfall into the rail corridor from both the crest and the face

Slope inclination: 80

Subsoil: Sandstone, weathered, jointy

Description

The rockfall protection system consists of a 147 l/m impact attenuator, a S3-130 (SPIDER®) drape tail, and a separate 650 m² S3-130 drape.

See the complete attenuator in this video

Your local contact

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards, Coastal Erosion Protection
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / United States
Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards, Coastal Erosion Protection
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / United States
John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards, Coastal Erosion Protection
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / United States
Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards, Coastal Erosion Protection
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / United States
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards
Geobrugg North America, LLC
Salem OR 97302 / United States