Switzerland
Switzerland

myGeobrugg

Monitoring - Sørøya II 2020

The Geobrugg GUARD on a barrier on the island of Sørøya north of the arctic polar circle.

Monitoring - Sørøya II 2020

Sørøya is hard to access: Journeys for controls inspections or maintenance are time consuming and expensive.

Monitoring - Sørøya II 2020

In the first phase, three monitoring devices were placed in different locations within the field. This site is affected by rockfall, snow loads and also a high corrosion rate.

Monitoring - Sørøya II 2020

The installation of the monitoring device requires no special knowledge. Only two nuts must be tightened.

 
 

Year of installation

2020

Initial situation

On the north Norwegian island Sørøya, above the main road from Hasvik to Sørvær, SPIDER Avalanche® Barriers were installed in 2019 to protect this remote - and touristic - road from rockfall and avalanches.

The island of Sørøya is situated north of Tromsø, north of the arctic polar circle. Though touristic in summer, it takes many hours to get there. The barriers of high-tensile steel are not only exposed to rockfall in summer and avalanches in winter, they are also close to the sea. This means corrosion is a permanent threat.

The Norwegian authorities requested a solution to monitor and report impacts or slow filling of the barriers. They also are interested in knowing about any corrosive effects the nearby Barents Sea is having on the barriers - not an average calculation, but reality time measurements at on these barriers.

Description

In the first phase, three GUARD monitoring devices were placed in different locations within the barrier field. An early finding was that corrosion is significantly higher at the barriers close to the sea than those further up the slope. These, are more frequently and more severely affected by rockfall, for example the barrier shown on the top-left edge of the picture below where one of the GUARDs is on duty.

Today authorities can use data to decide when measures at the barriers are to be taken. In this way inspection trips can be reduced and maintenance works can be bundled. More importantly, safety increases as the situation can be assessed and acted upon when a report is received. 

Contractor

Protected object

Road, Touristic infrastructure, Infrastructure

Other installed applications

Avalanche Prevention

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail