United States
United States

myGeobrugg

SBB CFF FFS - CMI / EIZ Biasca

Slope Stability - SBB CFF FFS - CMI   EIZ Biasca 2022

Over half a kilometer long - the protected area

Slope Stability - SBB CFF FFS - CMI   EIZ Biasca 2022

Installation of the mesh

Slope Stability - SBB CFF FFS - CMI   EIZ Biasca 2022

The installation requires great care because of the mesh offset

Slope Stability - SBB CFF FFS - CMI   EIZ Biasca 2022

Next to the installations, the Cima di Biasca (2,574 meters) rises almost vertically into the air

Slope Stability - SBB CFF FFS - CMI   EIZ Biasca 2022

Carefully installed, double-layered and staggered meshes

Slope Stability - SBB CFF FFS - CMI   EIZ Biasca 2022

The dam already stabilized in 2018

Slope Stability - SBB CFF FFS - CMI   EIZ Biasca 2022

Dam protected with netting (2018) from above

Slope Stability - SBB CFF FFS - CMI   EIZ Biasca 2022

The roof under the two layers of mesh protects against sun and rain

Slope Stability - SBB CFF FFS - CMI   EIZ Biasca 2022

View from the protective roof in the direction of Biasca

 

Year of installation

2022

Initial situation

One of Europe’s most important rail links passes through the Gotthard. The maintenance and intervention center of the Swiss Federal Railways (SBB) in Biasca, south of the Gotthard base tunnel, was endangered by rockfall, falling boulders and stone splinters.

In particular, the rocks falling on the building at 280 km/h were an exceptional hazard due to the high speed. The buildings, the track field, and the people working there had to be protected.

Description

After extensive planning, it was decided to protect the entire plant over a length of more than 500 meters with a roof made of mesh.

Since the dangerous splinters are relatively small, double and staggered installation was carried out with G65/4 mesh (65 mm opening, 4 mm wire thickness). In total, it was 70,000 square meters for the roof and side skirts.

In 2018, the dam that runs parallel to the plants was stabilized by 8,500 square meters of G65/4 mesh.

Country/Region

Switzerland

Other participating companies

Protected object

Railway, Infrastructure

Your local contact

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / United States Regional Manager California

E-Mail

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Natural Hazards
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Natural Hazards
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / United States Regional Manager Rocky Mountains / Central USA

E-Mail

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Natural Hazards
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / United States Regional Sales Manager Southeast

E-Mail

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Natural Hazards
Impact Protection
Geobrugg North America, LLC,OR 97302 Salem / United States Regional Sales Manager Pacific Northwest and Hawaii

E-Mail