Switzerland
Switzerland

myGeobrugg

S7 Express Road Lubien bypass slope stabilization

Slope Stability - S7 Express Road Lubien bypass slope stabilization 2009

Rockface stabilized with SPIDER® net

Slope Stability - S7 Express Road Lubien bypass slope stabilization 2009

Holding back rock blocks

Slope Stability - S7 Express Road Lubien bypass slope stabilization 2009

Not only road protection: also protecting this statue of a saint

Slope Stability - S7 Express Road Lubien bypass slope stabilization 2009

Protected road

 

Year of installation

2009

Initial situation

-

Description

High water flows.

Customer

National Road dept. Warsaw / GDDKiA Warszawa

Contractor

IMB Podbeskidzie Sp. z o.o.

Protected object

Road

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Andrzej Kulawik Engineering Office

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail