Switzerland
Switzerland

myGeobrugg

Slope Stability - Portal Fusca 2013

Final stabilization

Slope Stability - Portal Fusca 2013

Both systems: TECCO® (upper section) and GREENAX® (lower section)

Slope Stability - Portal Fusca 2013

Greening process

Slope Stability - Portal Fusca 2013

Front view of the slope

 

Year of installation

2013

Initial situation

The customer wanted an environmentally friendly and cost-efficient solution to protect the access road to the homes.

Description

In the Portal del Fusca condominium, over 3'000 m² are protected by two kinds of meshes: TECCO® G65/3 in the very critical areas with falling blocks and GREENAX® drape in the sectors with superficial erosion.

Customer

Private

Engineering

Geocing S.A.S.

Protected object

Road, Residential area

Corrosion protection

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Your local contact

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland

E-Mail