Hydraulic Power Plant Nihuil 2 - San Rafael

Rockfall Protection - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

This two-cubic-meter rock block was stopped

Rockfall Protection - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

The powerhouse of the Nihuil Hydraulic Power Plant

Rockfall Protection - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

Maintenance work on the INT rockfall barrier

Rockfall Protection - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

View of the A3S / RXI-100 barrier

 

System length

10 m - 70 m

 

Year of installation

2019

Initial situation

The powerhouse of the Nihuil 2 Hydraulic Power Plant suffered from rock impacts coming down from the adjacent slopes. In 2007, 10 dynamic rockfall protection barriers were installed to protect the infrastructure.

Systems installed:
1) Barrier A1S: RXI-100. Capacity: 1000 kJ. Length: 10 m. Height: 3,0 m
2) Barrier A2S: RXI-100. Capacity: 1000 kJ. Length: 10 m. Height: 3,0 m
3) Barrier A3S: RXI-100. Capacity: 1000 kJ. Length: 40 m. Height: 3,0 m
4) Barrier B: RXI-150. Capacity: 1500 kJ. Length: 54 m. Height: 3,0 m
5) Barrier C1S: RXI-025. Capacity: 250 kJ. Length: 10 m. Height: 4,0 m
6) Barrier C2S: RXI-025. Capacity: 250 kJ. Length: 10 m. Height: 4,0 m
7) Barrier INF1: RXI-030. Capacity: 300 kJ. Length: 30 m. Height: 4,0 m
8) Barrier INF2: RXI-030. Capacity: 300 kJ. Length: 70 m. Height: 4,0 m
9) Barrier INT: RXI-100. Capacity: 1000 kJ. Length: 60 m. Height: 5,5 m
10) Barrier D1: RXI-075. Capacity: 750 kJ. Length: 20 m. Height: 4,0 m

Description

After a 5-ton block had hit the barrier, a general maintenance of all barriers was carried out in 2019. The works included:

- Cleaning the barriers
- Replacement of a ring net section, retaining cables, secondary meshes, and brakes
- Realignment of side post
- Fixation of cable ties

Customer

Protected object

Infrastructure

Corrosion protection

Galvanized

Other participating companies

San Juan Vertical

Other installed applications

Rockfall Protection

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail