Switzerland
Switzerland

myGeobrugg

Huallalolén, Seca and Ñilhue ravines

Debris Flow & Shallow Landslide Protection - Huallalolén, Seca and Ñilhue ravines 2022

Huallalolen barriers

Debris Flow & Shallow Landslide Protection - Huallalolén, Seca and Ñilhue ravines 2022

Huallalolen barrier installation

Debris Flow & Shallow Landslide Protection - Huallalolén, Seca and Ñilhue ravines 2022

Ring net, Huallaolen barrier

Debris Flow & Shallow Landslide Protection - Huallalolén, Seca and Ñilhue ravines 2022

Huallalolen barrier 1

Debris Flow & Shallow Landslide Protection - Huallalolén, Seca and Ñilhue ravines 2022

Huallalolen barrier 2

Debris Flow & Shallow Landslide Protection - Huallalolén, Seca and Ñilhue ravines 2022

Huallalolen barrier 3

Debris Flow & Shallow Landslide Protection - Huallalolén, Seca and Ñilhue ravines 2022

Secs barrier

Debris Flow & Shallow Landslide Protection - Huallalolén, Seca and Ñilhue ravines 2022

Nilhue barrier 1

Debris Flow & Shallow Landslide Protection - Huallalolén, Seca and Ñilhue ravines 2022

Nilhue barrier 2

Debris Flow & Shallow Landslide Protection - Huallalolén, Seca and Ñilhue ravines 2022

Nilhue barrier 3

 

System length

10 m - 20 m

 

Year of installation

2022

Initial situation

End of January 2021, the metropolitan area of Santiago endured heavy rainfalls of more than 116 mm. A phenomenon that had not occurred since 1933. This, plus the scarce vegetation in the mountains and a zero isotherm above 3,500 meters, activated several streams and gullies.

In the commune of Lo Barnechea the water affected homes, streets, roads, and infrastructure and caused emergency works.

Description

The solution consists of seven dynamic barriers of the VX-type installed in the three streams affected mainly by the floods.

  • Seca gully: 1 VX-80-H4 barrier 16 meters wide and 4 meters high
  • Ñilhue gully: 1 VX-160-H6 barrier 13 meters wide and 6 meters high and 2 VX-140-H4 barriers 12 meters wide and 4 meters high
  • Huallalolén gully: 3 VX-140-H4 barriers 18 meters wide and 4 meters high

The retention capacity of all seven ring net barriers is 6’900 m³.

Customer

Directorate of Hydraulic Works DOH

Protected object

Road, Residential area, Infrastructure

Corrosion protection

Galvanized, GEOBRUGG SUPERCOATING

Other participating companies

Pucará S.A.

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail