Fierza Hydroelectric Power Station #2

Debris Flow & Shallow Landslide Protection - Fierza Hydroelectric Power Station #2 2014

Installed SL-150 shallow landslide barrier.

Debris Flow & Shallow Landslide Protection - Fierza Hydroelectric Power Station #2 2014

Installation of post and ropes with brake rings.

Debris Flow & Shallow Landslide Protection - Fierza Hydroelectric Power Station #2 2014

Installation of SPIDER® high-tensile steel mesh on the barrier.

Debris Flow & Shallow Landslide Protection - Fierza Hydroelectric Power Station #2 2014

Finished SL-150 shallow landslide barrier.

 

Systems

 

System length

40 m - 75 m

 

Year of installation

2014

Initial situation

Shallow landslides were slipping into the lake and surrounding road.

Description

Landslide protection with shallow landslide barriers SL-150.

Country/Region

Albania

Customer

KESH Albania

Engineering

-

Contractor

Cresta Geo Switzerland

Other participating companies

-

Protected object

Road, Building

Corrosion protection

Galvanized

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland Country Manager Southern Switzerland

E-Mail