United States
United States

myGeobrugg

Underground & Open Pit Mining - Craster Quarry Car Park 2019

First small rock fall stopped only days after completion.

Underground & Open Pit Mining - Craster Quarry Car Park 2019

The imposing west wall, showing recent rock fall.

Underground & Open Pit Mining - Craster Quarry Car Park 2019

Posts in place ready for pulling of ring net panels. Note the rope separation for a direction change from the west wall to the back wall of the quarry.

Underground & Open Pit Mining - Craster Quarry Car Park 2019

Change of direction after completion of the barrier.

Underground & Open Pit Mining - Craster Quarry Car Park 2019

Attaching of the secondary mesh.

 

Systems

 

Year of installation

2019

Initial situation

The client planned to extend the current car park. It was identified that the new areas of the car park could be at risk of falling rocks from the quarry walls. The designer calculated that the energy of the falling blocks would require a 2 metres high 500 kJ rockfall barrier.

Description

We were approached by the client asking for advice on which would be the best barrier to use for this project.  After being presented the options he went for the RXE-500. This gave a good balance between cost, performance, and ease of installation in the expected ground conditions.

Colin Jones (Rock Engineering) were selected to install the barrier, on arriving at site it was rapidly ascertained that the ground conditions were not rock at surface as expected, but a several metres thick layer of made up ground.  Both the client and contractor were impressed with the speed we were able to mobilise to site. Within a few hours, we had a new plan in place for post bases and anchors using Geobrugg standard details enabling a rapid approval by the design engineer.

The barrier was built two weeks ahead of the schedule programmed by the contractor. They attributed this to the ease of installation combined with the clarity of the manuals along with the ease of support via telephone or site visits from Geobrugg engineers.

Customer

Northumberland County Council

Engineering

Daeargeo

Contractor

Colin Jones (Rock Engineering) Ltd.

Protected object

Mine / Quarry, Touristic infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / United States Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / United States

E-Mail

John Kalejta
 

John Kalejta

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,KS 67226 Wichita / United States

E-Mail

Bob Lyne
 

Bob Lyne

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / United States

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Natural Hazards
Geobrugg North America, LLC,OR 97302 Salem / United States

E-Mail