myGeobrugg
2026
Rockfall events had made their way through a temporary barrier and down to the coach parking at road level.
Working with SRGeo, rockfall modelling was undertaken, and a 1000 kJ energy-capacity rockfall barrier was required. Bounce height was low due to the quantity of trees and soft materials overlying the bedrock. The proximity of the Gorge walls at the Easterly extent of the site leads to a rockface connection. Occasional gully features required specialist materials for closing out the potential for rocks to roll under the barrier line.
Also see our rockfall protection solution from 2020 at Cheddar
United Kingdom
Touristic infrastructure