Switzerland
Switzerland

myGeobrugg

Slope Stability - Minera Panama 2016

Minera-Panama, overview

Slope Stability - Minera Panama 2016

Detail of the mesh

 
 

Year of installation

2016

Initial situation

Cracking small fragments required the protection of a sector in the mine.

Geology

Rock

Description

The designer chose a mesh drape  - DELTAX® G80/2 - to protect people, equipment and infrastructure in the crusher chambers area.

Customer

FIRST QUAMTUM Limited

Contractor

SRG

Protected object

Mine / Quarry

Corrosion protection

GEOBRUGG ULTRACOATING

Engineering

Klohn Crippen Berger

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail