Rockfall Protection - Haraz Road AbAli 2012

The barriers protect the road against rockfalls. Six RXI-500 barriers which can absorb up to 5000 kJ were installed on the site totaling 518 meters with post heights ranging from 6.5 to 8.5 meters. Additionally: RXI-300 (3000 kJ, 70 meters long) and an RXI-200 (2000 kJ, 54 meters long). Slope stabilization with TECCO® G65/3. In total, about 10,200 square meters of slope stabilization and drapery systems were installed on the site.

Rockfall Protection - Haraz Road AbAli 2012

AbAli rockfall zone without protection measures which clearly shows the risks present at the road

Rockfall Protection - Haraz Road AbAli 2012

A specialist from Geobrugg is surveying the site in order to gather the necessary information for the design of the rockfall barriers

Rockfall Protection - Haraz Road AbAli 2012

Record of significant rockfall events in the project zone

Rockfall Protection - Haraz Road AbAli 2012

Three mobile cranes were drilling and grouting for the project. In total, 8,000 meters of drilling and grouting of boreholes were completed.

Rockfall Protection - Haraz Road AbAli 2012

RXI-500 posts being installed on top of the masonry wall

Rockfall Protection - Haraz Road AbAli 2012

ROCCO® ring nets for RXI-500 (5000 kJ) are being installed using a basket lift with a mobile crane

Rockfall Protection - Haraz Road AbAli 2012

Lifting heavy 8.5 meters RXI-500 posts using a mobile crane

Rockfall Protection - Haraz Road AbAli 2012

Set-up of the project site in order to control passing traffic

Rockfall Protection - Haraz Road AbAli 2012

Example of a significant block being caught during the installation phase!

Rockfall Protection - Haraz Road AbAli 2012

Installing a TECCO® drape system in order to stabilize the slope

Rockfall Protection - Haraz Road AbAli 2012

SPIDER® System is applied in order to stabilize a massive block

Rockfall Protection - Haraz Road AbAli 2012

Installed barriers on the slope protecting the road against rockfalls

Rockfall Protection - Haraz Road AbAli 2012

Final view of SPIDER® System stabilizing a large block

Rockfall Protection - Haraz Road AbAli 2012

Example of a rockfall incident at the installed barrier سيستم هاي سنگ گير در پروژه کرج

Rockfall Protection - Haraz Road AbAli 2012

Two RXI-500 (5000 kJ) rockfall barriers adjacent to each other

 

System length

30 m - 115 m

 

Year of installation

2012

Initial situation

Haraz is a major route connecting Tehran to the Northen cities in Mazandaran province by the Caspian Sea. As Haraz connects Tehran to the Northern part of Iran, it has to go through Alborz mountains. Along the road, there are many areas with rockfall incidents or slope instabilities.

In AbAli area, the situation was much worse. Massive rockfalls occurred over the course of the years which caused significant damages. Traffic was also increasing year over year and the need to extend the current road & protect it against hazards was a high priority.

Tehran RMTO (Road Maintenance & Transportation Office) considered various solutions in order to stabilize the current situation. Knowing that the road extension project was also in the works, using traditional protection measures such as concrete gallery was in question as it was both very costly and road closures were required.

Description

In order to identify the riskiest areas, specialists from Geobrugg and Geotech executed a detailed study of all hazards. Rockfall barriers and slope stabilization solutions were developed for each specific area in order to protect the road. (The road was also extended from two lanes to five lanes.)

The protected area was about 650 meters long. A total of eight rockfall barriers with highest energy class of 5000 kJ were installed. Back in 2012 this project definitely set a record in the Middle East - and worldwide!

Customer

Tehran Road Maintenance & Transportation Office

Contractor

Geotech Company

Protected object

Road

Corrosion protection

GEOBRUGG SUPERCOATING

Other installed applications

Slope Stability

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / United States Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / United States Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / United States Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / United States Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / United States Sales Director

E-Mail