GEOHAZARD - FOLLOW US

语言
中文zh
美国
我的布鲁克

登记处

还没有账户,需要注册吗?

作为注册的myGeobrugg用户,您可以扩展访问下载,我们的尺寸标注工具和我们的活动。

现在注册
布鲁克集团成员
美国
Favazzina 2015 - Geobrugg Favazzina 2015 - Geobrugg
Favazzina 2015 - Geobrugg Favazzina 2015 - Geobrugg
Favazzina 2015 - Geobrugg Favazzina 2015 - Geobrugg
Favazzina 2015 - Geobrugg Favazzina 2015 - Geobrugg
Favazzina 2015 - Geobrugg Favazzina 2015 - Geobrugg
Favazzina 2015 - Geobrugg Favazzina 2015 - Geobrugg
Favazzina 2015 - Geobrugg Favazzina 2015 - Geobrugg
Favazzina 2015 - Geobrugg Favazzina 2015 - Geobrugg
Favazzina 2015 - Geobrugg Favazzina 2015 - Geobrugg
Favazzina 2015 - Geobrugg Favazzina 2015 - Geobrugg

Favazzina

   分享
地点
Favazzina
国家/地区
意大利
安装年份
2015
客户
Regione Calabria
工程
Donatella Palma, Geoflum Engineering SrL
承包商
Idrogeo Srl, Cosenza
防护对象
Road, Railway
系统
VX100-H6, UX100-H4, UX180-H6
系统的高度
4.0 m, 6.0 m
腐蚀保护
GEOBRUGG SUPERCOATING®
系统道数
19
张力
10000 m³
情况

The western side of Calabria, in southern Italy, is characterized by strongly altered orthogneiss outcrops, which give rise to fine and coarse sands. With heavy rainfalls, they are brought down to the valley and channeled into the famous "fiumare".

This phenomenon is particularly intense in the area of Favazzina, along the River Scirò. There it threatens the railway network, the national highway SS18, and the local road network.

描述

A series of Geobrugg barriers have been installed to limit the risk of debris flows . This deterrent system for debris flows was developed by Geobrugg with the Swiss research institute WSL in Birmensdorf, part of the Swiss Federal Institute of Technology Zurich (ETH), following the field trials in Illgraben, Switzerland. Also check Illgraben on YouTube.

The system consists of 19 barriers of various types: UX180, UX100 and VX100 of varying height from 4 to 6 meters, for a total of 970 square meters. All Geobrugg barriers are CE marked.

The week after the installation of the first barriers, a debris flow occurred. It was completely held back by the highest situated barrier, and thus saved and protected the downstream site. Subsequent events have filled the other barriers. After  inspection, it was decided not to proceed with emptying in order not to trigger further landslide movements. The retained debris flow material stabilizes the banks of the channel and thus reduces the formation of further debris flow. Inspections also revealed the excellent condition of the post-event structure: no intervention on the barriers was necessary.  Only some anchorages were slightly damaged. The braking system showed no deterioration.

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
自然災害防護
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
Phone +1 860 377 3230

联系方式

Saleh Feidi
Saleh Feidi
Regional Manager California
自然災害防護
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
Phone +1 909 706 8964

联系方式

John Kalejta
John Kalejta
Regional Manager Central US
自然災害防護
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
Phone +1 505 220 1404

联系方式

Bob Lyne
Bob Lyne
Regional Manager Southeast
自然災害防護
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
Phone +1 336 337 0945

联系方式

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
自然災害防護
Geobrugg North America, LLC
22 Centro Algodones
Phone +1 505 771 4080
手机 +1 505 400 0796

联系方式

Tim Shevlin
Tim Shevlin
Sales Director
自然災害防護
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / 美国
Phone +1 503 423 7258

联系方式