США
США

myGeobrugg

Ограждения для дорог - Clarea Bridge 2020

Clarea bridge, Susa Italy

Ограждения для дорог - Clarea Bridge 2020

Sleeves were installed every 4 m to attach the panels to the bridge

Ограждения для дорог - Clarea Bridge 2020

A particularly high performance crane was used to lift the mesh panels from the pre-assembly area to the deck

Ограждения для дорог - Clarea Bridge 2020

Panels installed into sleeves

Ограждения для дорог - Clarea Bridge 2020

Mobile debris fence panel has minimal visual impact

Ограждения для дорог - Clarea Bridge 2020

Sleeved mobile debris fence system protects both the traffic above and the tunnel below

Ограждения для дорог - Clarea Bridge 2020

Secondary mesh installed in order to stop small debris from dropping off the bridge

 

Системы

Mobile Debris Fence Специальные решения Mobile Road Fencing

 

Длина системы

2540 m

 

Год установки

2020

Ситуация

The Trans-European Network Transport is building a new railway line from Lyon to Turin to complete the Mediterranean Corridor. Near Turin, the railway line passes under the Clarea Bridge. Therefore, starting with the works, the railway line had to be protected from falling objects. Due to the project's international significance, the customer wanted to install a tested and approved system.

Описание

Our mobile debris fence system was modified to the Clarea bridge. Instead of using concrete barriers for panel fixation, external sleeves had to be developed, which could be mounted to the bridge. As the fixation method was changed to the original homologated mobile debris fence system, intensive testing took place following the FIA Standard 3502-2018 debris fence. The test procedure includes a car impact with a speed of 120 kph, which exceeds the speed driven in this bridge section.

As delivery via several tunnels was impossible, the panels assembly took place under the bridge. The panel racks were driven to the site along the bridge for installation. One half of the bridge site conditions required a large crane to lift the panel racks to the installation truck. This service, along with the sleeve and panel installation, was provided as a turnkey solution.

For enhanced safety, a secondary mesh layer was installed to prevent small objects from falling.

The complete project foresees about 2'540 meters of barriers on the two parallel freeway lanes (four sides).

Клиент

Подрядчик

Dahil olan diğer şirketler

Защищаемый объект

Дорога, Железнодорожная линия

Представитель в Вашем регионе

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / США Regional Manager Northeast

Электронная почта

Saleh Feidi
 

Saleh Feidi

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / США

Электронная почта

John Kalejta
 

John Kalejta

Инженерная защита
Гидротехника
Geobrugg North America, LLC,KS 67226 Wichita / США

Электронная почта

Bob Lyne
 

Bob Lyne

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / США

Электронная почта

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Инженерная защита
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Электронная почта

Tim Shevlin
 

Tim Shevlin

Инженерная защита
Geobrugg North America, LLC,OR 97302 Salem / США

Электронная почта