 - Clarea Bridge 2020

Clarea bridge, Susa Italy

 - Clarea Bridge 2020

Sleeves were installed every 4 m to attach the panels to the bridge

 - Clarea Bridge 2020

A particularly high performance crane was used to lift the mesh panels from the pre-assembly area to the deck

 - Clarea Bridge 2020

Panels installed into sleeves

 - Clarea Bridge 2020

Mobile debris fence panel has minimal visual impact

 - Clarea Bridge 2020

Sleeved mobile debris fence system protects both the traffic above and the tunnel below

 - Clarea Bridge 2020

Secondary mesh installed in order to stop small debris from dropping off the bridge

 
 

시스템 길이

2540 m

 

설치 년도

2020

Situation

The Trans-European Network Transport is building a new railway line from Lyon to Turin to complete the Mediterranean Corridor. Near Turin, the railway line passes under the Clarea Bridge. Therefore, starting with the works, the railway line had to be protected from falling objects. Due to the project's international significance, the customer wanted to install a tested and approved system.

Description

Our mobile debris fence system was modified to the Clarea bridge. Instead of using concrete barriers for panel fixation, external sleeves had to be developed, which could be mounted to the bridge. As the fixation method was changed to the original homologated mobile debris fence system, intensive testing took place following the FIA Standard 3502-2018 debris fence. The test procedure includes a car impact with a speed of 120 kph, which exceeds the speed driven in this bridge section.

As delivery via several tunnels was impossible, the panels assembly took place under the bridge. The panel racks were driven to the site along the bridge for installation. One half of the bridge site conditions required a large crane to lift the panel racks to the installation truck. This service, along with the sleeve and panel installation, was provided as a turnkey solution.

For enhanced safety, a secondary mesh layer was installed to prevent small objects from falling.

The complete project foresees about 2'540 meters of barriers on the two parallel freeway lanes (four sides).

Country/Region

이탈리아

Customer

Contractor

Subcontractor

Protected object

Road, Railway

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

자연 재해
수리학
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 , Msc. Env. Eng.

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일