Szwajcaria
Szwajcaria

myGeobrugg

Stabilizacja skarp - Tamina Bridge 2013

With its 265 meters span, the Tamina Bridge is one of the largest arch bridges in Europe

Stabilizacja skarp - Tamina Bridge 2013

High tensile steel drapes made out of TECCO® and DELTAX® mesh came first: thus protecting the road during the construction phase and allowing to build the bridge

Stabilizacja skarp - Tamina Bridge 2013

The bottom border ropes are placed ca. 50 centimeters above the protected road which enables easy maintenance

Stabilizacja skarp - Tamina Bridge 2013

High tensile steel mesh TECCO® G65/3 is nearly invisible on the slopes

Stabilizacja skarp - Tamina Bridge 2013

High tensile steel mesh TECCO® G65/3 is nearly invisible on the slopes, especially when partially covered by vegetation

Stabilizacja skarp - Tamina Bridge 2013

Visible top border rope anchored by 3.0 to 4.0 meters long wire rope anchors installed between 3.3 to 3.5 meters between each other

Stabilizacja skarp - Tamina Bridge 2013

Integrated into the landscape - TECCO® G65/3 and DELTAX® G80/2 high tensile meshes stay almost invisible

 
 

Rok Instalacji / Montazu

2013

Sytuacja początkowa

The villages of Valens and Pfäfers are in the Swiss Canton of Grisons. They are separated by the deep Tamina valley. The Valensstrasse connects Bad Ragaz with Valens and runs along the left side of the valley. It is primarily located in an active landslide area. There have been problems at the Valenserstrasse for many years due to difficult geological conditions.  Smaller and larger slides, including rockfalls occured regularly. The road no longer met the requirements of administration. Their solution was visually unobtrusive, fully safe and  allowed the Tamina Bridge to be officially opened in summer 2017.

We have taken information from the German website of the Civil Engineering of the Canton of St. Gallen.

Geologia

Limestone

Opis zastosowanego rozwiazania

During the construction phase, the Valenserstrasse had to be protected as an access road that later became the Tamina Bridge. The mesh which was installed in early 2013 not only meets the safety requirements of the road authorities, but perfectly integrates into the landscape. The TECCO® wire mesh is barely visible on the gray rock or under vegetation. An ideal solution for the Tamina valley with its scenic beauty and ecological value.

Kraj / Region

Szwajcaria

Inwestor

Tiefbauamt Kanton St. Gallen

Projektant

wlw Bauingenieure AG, Mels

Wykonawca

Gall Forstunternehmung AG, Berschis

Chroniony Objekt

Road

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Osoba kontaktowa na miejscu

René Müller
   

René Müller

Country Manager Western Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Western Switzerland

Formularz kontaktowy

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Formularz kontaktowy

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria , Msc. Env. Eng.

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Szwajcaria Country Manager Southern Switzerland

Formularz kontaktowy