미국
미국

myGeobrugg

비탈면 보강 시스템 - Tamina Bridge 2013

With its 265 meters span, the Tamina Bridge is one of the largest arch bridges in Europe

비탈면 보강 시스템 - Tamina Bridge 2013

High tensile steel drapes made out of TECCO® and DELTAX® mesh came first: thus protecting the road during the construction phase and allowing to build the bridge

비탈면 보강 시스템 - Tamina Bridge 2013

The bottom border ropes are placed ca. 50 centimeters above the protected road which enables easy maintenance

비탈면 보강 시스템 - Tamina Bridge 2013

High tensile steel mesh TECCO® G65/3 is nearly invisible on the slopes

비탈면 보강 시스템 - Tamina Bridge 2013

High tensile steel mesh TECCO® G65/3 is nearly invisible on the slopes, especially when partially covered by vegetation

비탈면 보강 시스템 - Tamina Bridge 2013

Visible top border rope anchored by 3.0 to 4.0 meters long wire rope anchors installed between 3.3 to 3.5 meters between each other

비탈면 보강 시스템 - Tamina Bridge 2013

Integrated into the landscape - TECCO® G65/3 and DELTAX® G80/2 high tensile meshes stay almost invisible

 

Year of installation

2013

Situation

The villages of Valens and Pfäfers are in the Swiss Canton of Grisons. They are separated by the deep Tamina valley. The Valensstrasse connects Bad Ragaz with Valens and runs along the left side of the valley. It is primarily located in an active landslide area. There have been problems at the Valenserstrasse for many years due to difficult geological conditions.  Smaller and larger slides, including rockfalls occured regularly. The road no longer met the requirements of administration. Their solution was visually unobtrusive, fully safe and  allowed the Tamina Bridge to be officially opened in summer 2017.

We have taken information from the German website of the Civil Engineering of the Canton of St. Gallen.

Geology

Limestone

Description

During the construction phase, the Valenserstrasse had to be protected as an access road that later became the Tamina Bridge. The mesh which was installed in early 2013 not only meets the safety requirements of the road authorities, but perfectly integrates into the landscape. The TECCO® wire mesh is barely visible on the gray rock or under vegetation. An ideal solution for the Tamina valley with its scenic beauty and ecological value.

Customer

Tiefbauamt Kanton St. Gallen

Contractor

Gall Forstunternehmung AG, Berschis

Protected object

Road

Corrosion protection

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Engineering

wlw Bauingenieure AG, Mels

Other installed applications

낙석방호시스템

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 미국 Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 미국 Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

자연 재해
유압 공학
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 미국 Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 미국 Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

자연 재해
Geobrugg North America, LLC,Salem OR 97302 / 미국 Sales Director

E-Mail