スイス
スイス

myGeobrugg

 - Danielsberg 2019

The rockfall protection system after completion

 - Danielsberg 2019

The infrastructure endangered by the rocks (top right in the picture)

 - Danielsberg 2019

A crane places the huge posts onto the base plates

 - Danielsberg 2019

All posts have been erected, afterwards the the suspension ropes get installed

 - Danielsberg 2019

The 112 meter long barrier was realized with a support rope separation

 - Danielsberg 2019

Once the transmission ropes have been installed, the nets are unfolded

 - Danielsberg 2019

The buildings are located directly in the hazard zone

 - Danielsberg 2019

The net bundles are hanging on the support rope, ready to unfold

 - Danielsberg 2019

The ring nets are connected with shackles

 - Danielsberg 2019

View from the east to the completed rockfall barrier

 - Danielsberg 2019

Overview of the RXE-10000 system at Danielsberg

 - Danielsberg 2019

The rockfall protection system after completion

 

システム

 

システム延長

- 112 m

 

設置年

2019

状況

Buildings and the main road into the Mölltal (Danielsberg) were regularly affected by rockfall. During the planning of hazard zones, geological surveys also identified a substantial rockfall risk for the future. The expected rock falls require constructions that can absorb the highest energies.

Various solutions for protecting the infrastructure were considered. An earth dam, for example, was not an option due to the limited space available.

Video of the installation

説明

Amongst the flexible rockfall barriers, only the Geobrugg RXE-10000 with an energy absorption capacity of over 10,000 kJ met the requirements in terms of energy absorption capacity. The area occupied by the barrier is relatively small.

This is the first rockfall protection project worldwide with a capacity of 10,000 kJ. The RXE-10000 system was certified in 2018.

顧客名

Wildbach- und Lawinenverbauung

落札者

Wildbach- und Lawinenverbauung

保護対象

道路, 建築, 居住区, インフラ

腐食防止

ジェオブルッグ ウルトラコーティング

エンジニアリング

Wildbach- und Lawinenverbauung, IBG-ZT GmbH, Geobrugg

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム