Камнепады, обвалы, осыпи - Danielsberg 2019

The rockfall protection system after completion

Камнепады, обвалы, осыпи - Danielsberg 2019

The infrastructure endangered by the rocks (top right in the picture)

Камнепады, обвалы, осыпи - Danielsberg 2019

A crane places the huge posts onto the base plates

Камнепады, обвалы, осыпи - Danielsberg 2019

All posts have been erected, afterwards the the suspension ropes get installed

Камнепады, обвалы, осыпи - Danielsberg 2019

The 112 meter long barrier was realized with a support rope separation

Камнепады, обвалы, осыпи - Danielsberg 2019

Once the transmission ropes have been installed, the nets are unfolded

Камнепады, обвалы, осыпи - Danielsberg 2019

The buildings are located directly in the hazard zone

Камнепады, обвалы, осыпи - Danielsberg 2019

The net bundles are hanging on the support rope, ready to unfold

Камнепады, обвалы, осыпи - Danielsberg 2019

The ring nets are connected with shackles

Камнепады, обвалы, осыпи - Danielsberg 2019

View from the east to the completed rockfall barrier

Камнепады, обвалы, осыпи - Danielsberg 2019

Overview of the RXE-10000 system at Danielsberg

Камнепады, обвалы, осыпи - Danielsberg 2019

The rockfall protection system after completion

 

Системы

 

Длина системы

- 112 m

 

Год установки

2019

Ситуация

Buildings and the main road into the Mölltal (Danielsberg) were regularly affected by rockfall. During the planning of hazard zones, geological surveys also identified a substantial rockfall risk for the future. The expected rock falls require constructions that can absorb the highest energies.

Various solutions for protecting the infrastructure were considered. An earth dam, for example, was not an option due to the limited space available.

Video of the installation

Описание

Amongst the flexible rockfall barriers, only the Geobrugg RXE-10000 with an energy absorption capacity of over 10,000 kJ met the requirements in terms of energy absorption capacity. The area occupied by the barrier is relatively small.

This is the first rockfall protection project worldwide with a capacity of 10,000 kJ. The RXE-10000 system was certified in 2018.

Страна / Регион

Австрия

Клиент

Wildbach- und Lawinenverbauung

Проектировщик

Wildbach- und Lawinenverbauung, IBG-ZT GmbH, Geobrugg

Подрядчик

Wildbach- und Lawinenverbauung

Защищаемый объект

Дорога, Строительство, Жилой район, Инфраструктура

Защита от коррозии

GEOBRUGG ULTRACOATING

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Western Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Western Switzerland

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ Project Manager Sales Eastern and Central Switzerland

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Country Manager Southern Switzerland

Электронная почта