Etats-Unis
Etats-Unis

myGeobrugg

Protection contre les chutes de pierres - Danielsberg 2019

The rockfall protection system after completion

Protection contre les chutes de pierres - Danielsberg 2019

The infrastructure endangered by the rocks (top right in the picture)

Protection contre les chutes de pierres - Danielsberg 2019

A crane places the huge posts onto the base plates

Protection contre les chutes de pierres - Danielsberg 2019

All posts have been erected, afterwards the the suspension ropes get installed

Protection contre les chutes de pierres - Danielsberg 2019

The 112 meter long barrier was realized with a support rope separation

Protection contre les chutes de pierres - Danielsberg 2019

Once the transmission ropes have been installed, the nets are unfolded

Protection contre les chutes de pierres - Danielsberg 2019

The buildings are located directly in the hazard zone

Protection contre les chutes de pierres - Danielsberg 2019

The net bundles are hanging on the support rope, ready to unfold

Protection contre les chutes de pierres - Danielsberg 2019

The ring nets are connected with shackles

Protection contre les chutes de pierres - Danielsberg 2019

View from the east to the completed rockfall barrier

Protection contre les chutes de pierres - Danielsberg 2019

Overview of the RXE-10000 system at Danielsberg

Protection contre les chutes de pierres - Danielsberg 2019

The rockfall protection system after completion

 

Systèmes

 

Longueur du système

- 112 m

 

Année d’installation

2019

Situation de départ

Buildings and the main road into the Mölltal (Danielsberg) were regularly affected by rockfall. During the planning of hazard zones, geological surveys also identified a substantial rockfall risk for the future. The expected rock falls require constructions that can absorb the highest energies.

Various solutions for protecting the infrastructure were considered. An earth dam, for example, was not an option due to the limited space available.

Video of the installation

Description

Amongst the flexible rockfall barriers, only the Geobrugg RXE-10000 with an energy absorption capacity of over 10,000 kJ met the requirements in terms of energy absorption capacity. The area occupied by the barrier is relatively small.

This is the first rockfall protection project worldwide with a capacity of 10,000 kJ. The RXE-10000 system was certified in 2018.

Pays / Région

Autriche

Client

Wildbach- und Lawinenverbauung

Ingénierie

Wildbach- und Lawinenverbauung, IBG-ZT GmbH, Geobrugg

Entrepreneur

Wildbach- und Lawinenverbauung

Objet protégé

Route/Rue, Bâtiment, Zone résidentielle, Infrastructure

Protection anticorrosion

GEOBRUGG ULTRACOATING

Votre contact local

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Risques naturels
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Etats-Unis Regional Manager California

E-mail

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Risques naturels
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

E-mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Risques naturels
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / Etats-Unis Regional Manager Rocky Mountains / Central USA

E-mail

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Risques naturels
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / Etats-Unis Regional Sales Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Risques naturels
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

E-mail

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Risques naturels
Impact Protection
Geobrugg North America, LLC,OR 97302 Salem / Etats-Unis Regional Sales Manager Pacific Northwest and Hawaii

E-mail