边坡稳定 - Valjevo-Resnik, Serbia 2017

Stabilized slope no. 5 using TECCO® SYSTEM³ nicely following slope morphology - part of the cut is extra erosion protected with TECMAT®

边坡稳定 - Valjevo-Resnik, Serbia 2017

Installation of erosion control TECMAT® under TECCO® G65/3 at slope no. 2 in progress

边坡稳定 - Valjevo-Resnik, Serbia 2017

Slope no. 2 stabilized with TECCO® G65/3 high tensile mesh

边坡稳定 - Valjevo-Resnik, Serbia 2017

Another view of the slope no. 2 stabilized with TECCO® G65/3 high tensile mesh

边坡稳定 - Valjevo-Resnik, Serbia 2017

TECCO® G65/3 during installation - for the construction crew's safety, all the drilling works are executed through the mesh

边坡稳定 - Valjevo-Resnik, Serbia 2017

Installation of high tensile steel mesh TECCO® G65/3 using a man lift on the slope no. 3

边坡稳定 - Valjevo-Resnik, Serbia 2017

Another view of the slope no. 3, fully stabilized with TECCO® SYSTEM³

边坡稳定 - Valjevo-Resnik, Serbia 2017

Thanks to perfect stabilization characteristics of the TECCO® SYSTEM³, the slope no. 5 was taken over by natural vegetation very fast, without hydro-seeding

边坡稳定 - Valjevo-Resnik, Serbia 2017

High tensile steel mesh TECCO® G65/3 combined with TECMAT® for extra erosion control stabilizing slope no. 7

边坡稳定 - Valjevo-Resnik, Serbia 2017

High tensile steel mesh TECCO® G65/3 combined with TECMAT® for extra erosion control stabilizing slope no. 7 from another perspective

 
 

安装年份

2017

情况

Because of continuous small rock falls, landslides, and erosion along the railway line Valjevo-Resnik, the maximum allowed speed had to be limited. The Serbian Railways decided to stabilize the slopes together with the revision of the railway line.

地質學

Contemporary alluvial sediments of the Topčiderska river and sandstone salt-clay sediments, so-called neocomic flysch. The neocomic flysch complex is mainly represented by fine-grained sandstone, alevrolites, marls and glaciers, with the passages and limbs of limestone and limestone brecco-conglomerates.

描述

Designers from CIP Belgrade, Marina Janković, and Ivana Vujović together with the assistance of Geobrugg's Representative Office in Croatia provided stabilizing solutions for 11 slopes. Problems of rockfall and slope stability were solved mostly with TECCO® System and SPIDER® System. Additionally, DELTAX® and GREENAX® meshes were used as a secondary mesh, as well as erosion control. Under the TECCO® System, TECMAT® was used as an anti-erosion layer.

One of the tunnel portals is protected against rockfalls by the GBE-100A-R barrier without retaining ropes.

国家/地区

塞尔维亚

客户

Železnice Srbije

工程

Institute of Transportation CIP, Beograd

承包商

RZD International LLC

分包商

Geosonda Konsolidacija a.d., Beograd

防护对象

Railway

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

本地联系方式

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 美国 Regional Manager Northeast

联系地址

Saleh Feidi, Regional Manager California
 

Saleh Feidi

自然災害防護
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国 , Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

自然災害防護
Geobrugg North America, LLC,KS 67226 Wichita / 美国 Regional Manager Rocky Mountains / Central USA

联系地址

Bob Lyne
 

Bob Lyne

Regional Sales Manager Southeast

自然災害防護
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 美国 Regional Sales Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

联系地址

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

自然災害防護
Geobrugg North America, LLC,OR 97302 Salem / 美国 Regional Sales Manager Pacific Northwest and Hawaii

联系地址